Rollinsford, NH installation April 2009
Click picture to enlarge.
Preparing to repair flood damage caused by beaver.
Showing depth of ruts before repair work.
Moving Eco-Stabilizers back into place.
Testing repaired trail.
Showing Eco-Stabilizers strength over large ruts.
Showing strength of Eco-Stabilizers with traffic over large ruts.
Rollinsford Installation May 2009
Click picture to enlarge.
Trail marked and ready for use. May 2009
Trail after our rainy weather recently. June 2009
Showing how it looks to ride in the rain. June 2009
Rollinsford Installation August 2010
Click picture to enlarge.
Rollinsford Installation July & November 2011
Click picture to enlarge.
Before pic showing wet ground.
Laying out pieces as we go.
Close up of soft, muddy ground.
Completed section. This install took less than an hour for two guys to put down.
Close up showing "open" spacing to extend trail length and width.
This configuration is 64" wide.
York's Property Rollinsford, July and November 2011
Click picture to enlarge.
"First part of install July 2011"
Half of this was installed in July and other half in November 2011.
Showing growth from July through November.
This is growth from July through November.
Close up of dense grass despite ATV traffic.
Andy's Field, Rollinsford, NH July 2012
Click picture to enlarge.
"Before work."
After doing the work.
Showing deep water.
This is before we do the repair.
Repair before.
Repair after.
"Before repair."
After work completed.
Showing powerline work.
Powerline work completed.