Rollinsford, NH installation April 2009
Click picture to enlarge.
|
Preparing to repair flood damage caused by beaver.
|
Showing depth of ruts before repair work.
|
Moving Eco-Stabilizers back into place.
|
|
|
|
Testing repaired trail.
|
Showing Eco-Stabilizers strength over large ruts.
|
Showing strength of Eco-Stabilizers with traffic over large ruts.
|
|
Rollinsford Installation May 2009
Click picture to enlarge.
|
Trail marked and ready for use. May 2009
|
Trail after our rainy weather recently. June 2009
|
Showing how it looks to ride in the rain. June 2009
|
Rollinsford Installation August 2010
Click picture to enlarge.
|
|
|
|
Rollinsford Installation July & November 2011
Click picture to enlarge.
|
Before pic showing wet ground.
|
Laying out pieces as we go.
|
Close up of soft, muddy ground.
|
Completed section. This install took less than an hour for two guys to put down.
|
Close up showing "open" spacing to extend trail length and width.
|
This configuration is 64" wide.
|
|
|
|
|
|
|
|
|
York's Property Rollinsford, July and November 2011
Click picture to enlarge.
|
"First part of install July 2011"
|
Half of this was installed in July and other half in November 2011.
|
Showing growth from July through November.
|
This is growth from July through November.
|
Close up of dense grass despite ATV traffic.
|
|
Andy's Field, Rollinsford, NH July 2012
Click picture to enlarge.
|
"Before work."
|
After doing the work.
|
Showing deep water.
|
This is before we do the repair.
|
Repair before.
|
Repair after.
|
"Before repair."
|
After work completed.
|
Showing powerline work.
|
Powerline work completed.
|
|
|